Aomori Prefecture Employee Dormitory Power Supply Expansion Work | Distribution Board and Transformer Replacement Electrical Work
[National Support] Corresponding to the power supply expansion of Lake Town Dormitory (Buildings 1 to 4). Total support for the replacement of distribution boards and transformer replacement work in each room.
We conducted power expansion work involving the replacement of distribution boards in each room and the replacement of transformers at the employee dormitory located in Aomori Prefecture (Mitsubishi Electric Building Solutions Corporation Lake Town Dormitory Buildings 1 to 4). Location of the work: Aomori Prefecture (employee dormitory, collective housing facility) Type of work: Power expansion work, replacement of distribution boards in each room, transformer replacement work, installation electrical work Scope of work: Material procurement, on-site electrical work, power-on testing 【Construction Details and Problem Solving】 This is a large-scale power expansion project aimed at strengthening the entire building's power distribution system due to increased electrical capacity. We safely and reliably carried out the replacement of old distribution boards in each room and the replacement of the core transformer for all buildings from 1 to 4 of the Lake Town Dormitory. Utilizing the solid electrical construction know-how cultivated in the manufacturing of control panels for plants and factories, we executed the entire process from selecting wiring routes to installation work and final power-on testing. *For more details, please refer to the materials available for download in the <Download Catalog>. Feel free to contact us with any inquiries.*
- Company:斎藤電機工業
- Price:Other